目录
1 总则···················································4
2 软景篇················································4
2.1 软景施工工艺品质标准·························4
2.1.1 软景施工强制条文····························4
2.1.2 场地清理········································4
2.1.3 种植土源准备··································4
2.1.4 排盐排碱和疏水层····························5
2.1.5 草坪建植工艺标准····························5
2.1.6 大树移植工艺标准····························9
2.1.7 冬季防护标准································14
2.1.8 兜底灌木施工工艺标准·····················15
2.2 后期养护管理标准······························16
2.2.1 管养维护工作标准化·························16
2.2.2 管养维护工作成果····························17
2.3 XX公司软景实景呈现效果·····················17
2.3.1 优秀软景施工实例·····························17
3 硬景篇·················································18
3.1 道路及硬质铺装标准·····························18
3.1.1 沥青道路铺装···································18
3.1.2 硬质铺装面层施工标准流程图··············19
3.1.3 施工单位样板段排版确认····················19
3.1.4 面层铺装石材施工工艺标准·················22
3.1.5 石材面层施工优秀案例 · ·· · ·· · · ·· · · ·· 27
3.1.6 水泥砖、烧结砖铺装· ··· ·· ··· ·· · ··· ··· ··30
3.1.7 防腐木铺装· ·· ·· · · ·· · ·· · · ·· · ·· · · ·· · ·31
3.1.8 路缘石(石材、水泥) ··· ·· · ·· ·· ·· ·· · ·· ·· 31
3.1.9 停车位············································32
3.2 细部节点施工工艺标准··························33
3.2.1 花钵柱细部工艺标准··························33
3.2.2 景墙立面细部节点工艺标准·················34
3.2.3 石材压顶细部节点工艺标准·················34
3.3 铁艺施工工艺标准·······························35
3.3.1 焊接安装关注要点····························35
3.4 装饰井盖工艺标准······························35
3.4.1 装饰井盖关注要点····························35
3.4.2 无框装饰井盖的基本做法···················35
3.5 景观照明、配电箱、装饰格栅工艺标准····36
3.5.1 景观照明安装工艺····························36
3.5.2 景观配电箱·····································36
3.5.3 装饰格栅工艺标准···························37
4 XX公司景观施工交付评测附表················37
4.1 测评说明··········································38
4.2 园林绿化工程实测实量表·····················39
4.3 园林绿化观感质量评估表·····················40
1 总则
本标准的制定是为了规范XX公司项目景观工程管理工作,是XX公司的强制性企业标准。
本标准在尊重所有相关工程规范和设计要求的前提下,着重于规范景观工程的施工工序管理、
施工工艺、工法的管理,以保证景观工程的最终质量和感观效果。同时结合行业发展现状,为确保
和提升XX公司开发项目中景观工程的品质,推动项目质量管理,特制定本标准。
本标准基于XX地区的气候环境制定。
2 软景篇
2.1软景施工工艺品质标准
2.1.1软景施工强制条文
(1)所有乔灌木品种均要求全冠移植。
(2)所有苗木、球类及地被类植物设计规格均为修剪后规格。
(3)大苗不允许短截,允许少量疏枝,确保冠型完整。
(4)所有苗木进场时需经甲方确认方可进场。
(5)地形须经甲方确认后,方可进入下一步种植工序。
(6)草坪必须按设计标准施工,须经甲方确认后,方可进入下一步种植工序。
(7)地被色块品种必选按设计要求选择,须做标准段施工,经甲方确认后方可大面积展开。
2.1.2场地清理
进场后做好清场工作,翻除石块垃圾及各种废弃物料,应注意清理土下暗埋废混凝土地坪及废弃石灰坑。工作区内如有坑洼积水,应查明原因,预先予以排除。将清除废物集中堆置,分期运至指定弃料场地。
2.1.3种植土源准备
甲方可根据项目情况抽检,对种植土进行PH值、含盐量等理化指标化验,不合格种植土严禁进场。
种植土要求疏松、透气、保肥能力强,无水泥、石灰、石头等妨碍植物生长的杂物。黄土、砂土、农田土为宜,严禁使用渣土、粘土、挖槽土和盐碱。
2.1.4 排盐排碱和疏水层
整体排盐:地库顶板上做疏水层,疏水层以上必须全部更换种植土。
局部排盐:必须要有组织排水,需要盲管数不得小于三根
检查要点:碎石层不得低于15cm;无纺布相互叠加大于30cm;有组织排水。
2.1.5 草坪建植工艺标准
(1)草坪铺植流程图:(2)草坪必须按设计标准施工,须经甲方确认后,方可进入下一步种植工序。
A: 草坪层:草块规格≥30cm×25cm×3cm。
B: 砂床层:5cm厚泥炭土或腐熟有机肥不种植砂(粒径0.5~2.0mm)混合的砂床层(压实状态)。
(有机肥/种植砂为3/7)。
C: 种植土壤层:25cm厚(含泥炭土或腐熟有机肥(300~500g/m2)和复合肥(30~40g/m2)的
种植土壤层(压实状态)。
D: 原土层
(3)坪床准备:坪床清理、翻耕、粗平整、给排水管线敷设、种植土壤层改良、砂床层整理、细平整。清理坪床以下不低于30cm影响植物生长的砖头石块水泥石灰等杂物排水坡度控制在0.3%~10%之间,较大地形坡度以不超过30度为宜选用快速取水阀灌溉。
(4)种植土壤层改良
选择优良表层种植土,土层厚度为20~30cm左右(压实状态),需无杂草及杂物(石头、水泥石灰等搅拌物残物、脚手架片、树根、杂草、砖瓦等)。如需改良可采用有机肥、膨化鸡粪或泥炭土等材料改良土壤板结状况;采用石膏和硫酸亚铁改良碱性土壤。当土壤过砂或过黏时,可采用砂黏互掺的办法来解决。
检查事项:
A:检查种植土壤质量、厚度以及土颗粒是否细小、均匀。
B:种植土层平整度、密实度是否符合设计及施工规范要求。
C:铺沙厚度及营养土的配比是否达标。
(5)细平整
将处理完毕的坪床土壤充分浇水1~2次后,利用滚筒适度滚压,由人工采用刮板操作将整个坪床基层处理平整。要求细平整后要保证坪床各材料均匀混合,坪床面耙平滑及一致,坪床无下陷。此环节为草坪建植坪床处理的重要节点。
检查事项:
A:检查地形坡度造型是否达到设计要求,弧度和饱满度是否达标。
B:坪床整体是否压实,无明显沉降现象。
C:坪床各组分是否混合均匀。
D:草坪材料品种、质量选择是否合适(草圃验苗)。
(6)草坪建植要求
A:草皮进场前需带甲方对草场进行考察确认,方可进场。
B:草皮进场前,甲方需检查确认,方可进场(草皮卷25cm×30cm×3cm)。
C:检查到场草坪草的色泽、密度,是否因长时间运输堆积造成黄苗、死苗。
(7)草坪建植方法
A:准备好铺植工具,如水管、喷头、平头铁铲、刮板、滚筒等。采用草坪卷或是草坪块满铺;铺后立即浇水;稍干后采。
B:用滚筒反复滚压;采用喷头少量多次雾状浇水;遵循1/3修剪原则;施肥原则少施勤施;杂
草除早除小除净;病虫害防。
C:治预防为主,提前发现,提早治疗。
(8)草坪与铺装关系
草坪周边高度必须应低于路牙、路面或落水的高度2~3cm,以灌溉水不致流出草坪。
(9)草坪与灌木关系
草坪与灌木之间依据灌木线形开设约5×5cm的凹线、V线槽,以突出灌木种植线条,界定两者关系。
(10)草坪施工期管控要点
配套设施检查:检查和确认市政配套管线和管井在此区域有无施工完毕、管线走向和埋深等:由项目公司协调不同与业之间的工作面的交接、交底确认,提供相关与业资料绿化施工单位,以避免不必要的返工和无意识的破坏。
铺样评审:鉴于草坪施工人员素质不一,为保证草坪施工品质,要求首车草坪进场后,建植做样至草坪铺植完成后滚压平整,由甲方评审验收,合格后方可按此标准大面积展开。如草坪不合格,后续草坪严禁进场;如铺植效果不过关,返工重新铺植直达通过甲方评审验收方可进入下步工序。
(11)草坪竣工验收标准
A.地形平滑、草坪平整,无明显凹凸不平。
B.草坪与灌木、路面、汀步及建筑等的关系符合要求。
C.抽样检查,检查区内杂草数量少于3/M²。
D.草坪长势良好,均匀、致密,色泽正常,无病虫害和空秃斑块。
E.正常养护浇灌或雨天时无积水。
F.填写草坪建植隐蔽工程及竣工验收记录表。
2.1.6 大树移植工艺标准(1)大树移植工艺标准流程:
(2)招标阶段:各投标单位需组织甲方对自身苗木资源进行考察,甲方需对各投标单位苗木资源进行评分,作为招标考核标准之一。所有进场苗木须由甲方号苗确认再进场。
(3)大树移植是指将胸径在20cm以上的落叶乔木和胸径在15cm以上的常绿乔木移栽到异地的活动,
包括苗木考察、场地清理、土沟开挖、断根处理、吊装运输、移栽定植及后期养护管理等。
土沟测算、开挖:以树干为中心,计算出的土球直径;顺着所画圆向外开沟挖土,沟宽60-80cm;
土球高度一般为土球直径的60-80%;对于细根可用利铲或铲刀直接铲断,粗大根必须用手锯锯断,切忌用其他工具硬性弄断撕裂;土球基本成形后将土球修整光滑,以利包扎;土球修整到1/2时逐渐向里收底,收到1/3时,在底部修一平底,整个土球呈倒圆台形。
10(4)根部处理
A.进场苗木必须进行根部处理,由甲方确认,方可进场
B.用植物生根液喷施根部,诱导大树快速生根;用植物根系消毒、杀菌液喷施土球,消毒防根腐;
原则喷整个土球,重喷根切面及须根细根系。
(5)捆扎土球:草绳捆扎要求松紧适度,均匀排水。
起吊大树:起吊部位必须做防护措施,防止破损。
(6)装车运输
吊装时应尽量避免损树伤皮和碰伤土球;装车时应用软绳,保护树皮;土球装车时要小心轻放,
且在土球的下方垫软如原生土或草绳,以防弄散土球;树干不后车板接触处必须由软木支撑;车箱
中土球两侧用软木或沙袋支垫;运输途中树冠应高于地面,防止枝冠损伤,并注意运输中树枝伤人
损物;路况不好,应缓慢小心行驶。
11(7)进场验苗
A.苗木进场时,甲方组织施工单位依据施工图、工程变更单检查乔木、灌木规格、树型、蓬型是
否符合设计要求;检查苗木出圃单、异地苗木必需检验植物检疫证是否齐全,对验收不合格的
苗木,进行退场处理。
B.地形达到设计效果经甲方初验合格后方可栽植大树
C.理解设计意图,根据现场空间,布置大树点位,并由甲方确认。放样顺序一般是骨架树木、然
后是亚乔木、最后是灌木的放样,从层次和呼应关系上更好的搭配。
12(8)树穴开挖
A:树穴大小,应比规定的根系或土球直径大20—30厘米,树穴口径穴槽必须垂直下挖,上口、下
底相等,严禁挖“锅形穴”。
B:施基肥、安装透气管,透气管的数量根据大树规格和土球大小有所变化。一般15至25厘米胸径
的大树移植,需要1至3个透气管;胸径大于25厘米的大树移植,需要3至6个透气管。
(9)疏枝除叶,保持全冠,禁止重剪
移栽定植:运到现场尽快定植注意观赏面和朝向,分层埋土砸实,做好水堰。
13 采用草绳包裹树干,防风保湿调节树干温度,浇透水,并适当添加生根粉,及时喷水保湿,慎
防树池积水。
(10)输液和灌根:
定植后及时对大树进行输液和灌根处理。前3次浇定根水时宜在水中加入适量的大树根动力或生
根剂等,促进大树发出新根,有利于提高大树成活率。
(11)乔木的支撑必须统一规范;四脚撑,选用干径7-8杉木杆,支撑点加垫保护层,以防伤皮,
支撑要求,不交付标准需保持一致
2.1.7 冬季防护标准
1415
A:对当年移植的常绿苗木如云杉、常绿球类及大规格花灌木(如紫薇)及绿篱等进行冬季防护措施。
B:防护材料可选择杉木杆、方木条以及竹杆,包裹材料可选择绿色无纺布、塑料纸,由项目公司根
据自己实际情况选择。
2.1.8 兜底灌木施工工艺标准
(1)兜底灌木施工流程:
(2) 兜底灌木首先放线: 种植灌木前必须做凹槽线:
16
灌木最外层3~5排加密处理,线条曲折圆滑自然美观,修5~8宽线沟,保证界面干净。地被色块、灌木兜底品种必选按设计要求选择,须做标准段施工,经甲方确认后方可大面积展开。
2.2 后期养护管理标准化
2.21 管养维护工作标准化
严格按照XX地区的养护规范执行:17
2.2.2管养维护工作成果
六个月前 六个月后
2.3 融创天津公司软景实景呈现效果
类别
乔木养护标准
整形式灌木
自然式灌木
花境养护标准
草坪养护标准
景观
1、植物群落结极合理,植株疏密得当,层次分明;
2、林冠线饱满
3、乔木灌木间层次合理,密度合适;
4、特殊造坥树符合设计意图
1、无缺株,无枯枝
2、修建必须保持三面以上平整饱满,直线处正直,曲线处弧度圆润
1、无缺株,无枯枝残花
2、同类开花植物花期一致
3、修建保持自然丰满
1、植株生长正常,株行距适宜,不露红土,高低错落有致,季相变化明显,枯枝残花量不
得大于8%
2、花卉色彩鲜艳,观赏期长
3、观花花卉适时开花,观叶植物叶色正常
1、草种纯,色泽均匀
2、成坪高度5-7cm,草坪表面达到平坢整洁
3、修剪后无残留草屑、剪口无焦口、撕裂现象生长
1、枝叶生长、色泽正常;
2、观花树木按时茂盛开花
3、观果树木正常结果
4、色叶树木季相变化明显
5、无枯枝枯叶
1、植株生长健壮,规格大小基本一致
1、植株生长健壮,规格大小基本一致
1、植株生长健壮,枝叶茂盛
1、生长茂盛
2、覆盖率大于95%
3、无空壳
切边
1、若不草坪交界处有切边,宽度不得大于15cm,深度为15cm
1、切边边缘清晰,宽度不得大于15cm
排灌
1、有完整的自然或管道排水系统,绿地里无积水显现,暴雨后5小时内雨水必须排完
2、植物不得出现失水萎蔫现象
1、排水良好,无积水
2、植株不得出现失水萎蔫现象
1、排水良好,雨后2小时内必须排完
2、植株不得出现失水萎蔫现象病虫害控制
1、基本无有害生物危害
2、枝叶受害率在10%以下
3、无影响景观的杂草
1、无明显病虫害
2、植物受害率控制在10%以下
3、无杂草
1、无明显病虫害
2、植物受害率控制在10%以下
3、无杂草
1、无明显病虫害
2、植物受害率控制在10%以下
3、无杂草
1、无明显病虫害
2、草坪草受害率控制在5%以下
3、基本无杂草
清洁
1、无垃圾
1、无垃圾
1、无垃圾
1、无垃圾2.3.1优秀软景施工实例
3.硬景篇
3.1道路及硬质铺装标准
3.1.1沥青道路铺装
(1)铺设需在其他工种结束之后进行,避免二次开挖的损坏、确保表面不受污染。
(2)路的横断面坡度控制在2-5%,直线段笔直,曲线连接自然,走水通畅,干净整洁。
18(3)50mm粗沥青,30mm细沥青。
(4)铺设完毕后1-2天,需要铺设彩条布等,进行成品保护。
(5)施工过程需一次完成,避免二次施工,对于不合格路径坚决整改重铺。
3.1.2硬质铺装面层施工标准流程图
3.1.3施工单位样板段排版确认
(1) 施工单位排版深化,必须由甲方确认方可进行下一步工序。
19石材排版示意
烧结砖排版示意
(2) 样板段,必须由甲方确认方可进行下一步工序。
20 深化排版前——无对缝或对中
深化排版后——对缝
21与深化排版图一致
3.1.4面层铺装石材施工工艺标准
(1)进厂检验:
A:品质、颜色、面层样式要符合设计要求,并与封样样品一致。
B:规格误差要控制在1㎜以内。
C:材料必须保证完整、无破损,无色差及明显质量差别,无法达到要求的一律退货禁止使用。
(2)石材保护:
A:彻底清洗:用水龙头加板刷,边冲边刷,以保证每块板材的清洁度。
B:完全晾干:清洗完后,因施工场地有限,不同的板材用不同的放置方法,以增加受风面积,加
快干燥,因天气因素,甚至用小太阳进行烘考。
C:六面体防护:完全晾干后固定人员进行六面防护,且配有与门搬运工,将做完防护石材逐块放
至指定地点,且块与块之间用小石子隔开,以加快晾干速度。一般防护做完石材放置时都面层
朝下,这样,铺装工人可以直接在背面抹黏结层。
D:注意现场二次搬运时的成品保护。
22(3)混凝土基层清理。(基层表面凹凸不平、遗留砂浆等,将容易产生面层下陷而积水)。清水湿
透基层,然后平铺中粗砂。
(4)水泥不中粗砂比例1:2-1:3为宜,干湿度控制标准是“手捏成团、落地即散”。
(5)在中粗砂基层上淋一层纯水泥浆。
23(6)利用砂板划出渗水口,加速水灰融合。
(7)在面层板材落定之前,需要在干基层上进行预铺,用以控制对缝、排版、平整度等细节。
(8)根据预铺效果,轻敲压实,利用靠尺控制平整度。
24(9)通过十字钉、小木片、竹片等控制开缝的宽度。
(10)面层铺装完成2-3天后,需要对开缝不齐的部位进行修整,切割出一致的宽度。
(11)清扫铺装缝中杂物后,对开缝浇透清水。
25(12) 填缝:用不缝同宽或略窄的木板或者钢筋条,压实填缝。
技巧:缝凹的深浅、形状控制在于木板底面的形状及施工时用力大小。
(13)清缝:清理其他铺装面污染,用海绵擦拭(海绵略带水份,使水自然渗入缝中)。
2627
(14)施工完成后应组织自检整改,注重细节,关注效果。
施工过程中应做好成品保护,一般采用无纺布、彩条布覆盖。
3.1.5 石材面层施工优秀案例
案例一:
案例二:案例三:
(1) 弧线:
A:做好曲线
28B:品质施工,过程保护
C:弧线呈现效果
293.1.6水泥砖、烧结砖铺装
(1)深化平排版图与样板段,均由甲方确认,方可进行下一步工序。
(2) 进场检验:
A:品质、颜色、面层样式要符合设计要求,并与封样样品一致。
B:规格误差要控制在1㎜以内。
C:材料必须保证完整、无破损,无色差及明显质量差别,无法达到要求的一律退货禁止使用。
(3) 施工要点
A:横向排版必须确保整模连接,或半模对接。
30B:收口处严格杜绝不规则小角贴补现象(要以整砖、半砖、等腰直角三角形砖块、成品转角砖收
边收口),保证铺装收边的最佳效果。
C:遇到雨水井、污水井、检查井等时须采用隐形井盖进行铺装,材料、工艺必须与大面铺装统一,
排版时必须与大面铺装排版相一致,选位时尽量靠边线、边角。
3.1.7 防腐木铺装
进场检验:
A:防腐木选样材料按设计提交产品检测报告,由甲方确认方可使用。
B:选料规整、做工精细、防腐性能高级。
C:含水率:≦8%、防腐度:≧95%、纹理清晰、品种符合设计要求,感观效果佳。
D:未达到标准的木材一律禁止使用。
3.1.8 路缘石(石材、水泥)
A:边角无缺损
B:表面色泽统一
C:无大面气孔
313.1.9 停车位
施工工艺:
A:路基的开挖:根据设计的要求,路床开挖,清理土方,并达到设计标高;检查纵坡、横坡及边线,
是否符合设计要求;修整路基,找平碾压密实,压实系数达90%以上,注意地下埋设的管线。
32B:面层铺设:面层为植草砖,在铺设时,应根据设计图案铺设植草砖,铺设时应轻轻平放,用橡胶
锤锤打稳定,但不得损伤砖的边角。然后用营养土填满植草砖孔洞,再植草,浇水养护。
植草砖内植草完成面土壤必须低于植草砖的上平面2㎝以上,防止车轮碾压造成草枯黄死亡。
3.2 细部节点施工工艺标准
3.2.1 花钵柱细部工艺标准
严格按照设计图纸施工:
33实景效果:
3.2.2 景墙立面细部节点工艺标准
严格按照设计图纸施工:
3.2.3 石材压顶细部节点工艺标准
严格按照设计图纸施工,注意竖向交圈,无缺角:
343.3 铁艺施工工艺标准
3.3.1 焊接安装关注要点
A:铁艺原材料壁厚与规格,必须满足设计要求。
B:铁艺施工需做样板段,由甲方确认,方可施工。
C:焊点饱满、平滑、焊接到位,连接平顺、自然,
无外部伤害、与安全隐患。
D:无明显缺漏、空挡;通体打磨、除锈和防腐喷
漆与业到位,无破损、瑕疵、锈斑现象出现。
E:安装固定牢靠,开启自如、无怪异响声;材料质感强烈、规格比例协调、锁扣简单而吻合度好。
3.4 装饰井盖工艺标准
3.4.1 装饰井盖关注要点
装饰井盖应严格按照设计要求执行,施工时应注意和窖井周围的铺装形式相融合,注重平整度、
精细工艺。
3.4.2 无框装饰井盖的基本做法
3536
3.5 景观照明、配电箱、装饰格栅工艺标准
3.5.1 景观照明安装工艺
(
1)安装牢固,底部着力基础与灯体连接紧密、结实牢靠、浑然一体。
(
2)硬质铺装界面安装时,底座应与铺装界面统一、融合。
(
3)设置铺装小平台、摆放掩盖盒或盆栽、小品等饰物进行美化、弱化处理,忌讳底座标高与铺
装面与统一,底盘、螺栓、接线盒等直接外露。
(
4)绿地里安装时,必须有较高大植物做背景,另外底部最好也要有小植被做底座弱化处理,底
盘或连接件可直埋时,一定要埋入地表以下。
(
5)忌讳底座与绿地标高与统一、底盘、螺栓、接线盒等直接外露,一定要全部埋入地表以下;
(
6)最好单面有较高大植物做背景,底部最好有小植被做弱化处理。景观照明安装点位应符合设
计规则。37
3.5.2 景观配电箱
(
1)配电箱安装位置应于活动公区位置,进出及操作、检修维护方便,严禁设置在低洼积水位置,
应方便用植物掩护和装饰的位置。
(
2)严禁设置在私家花园及其边线;配电箱选型为室外型配电箱,设置的箱体高度与能高于1.4 米。
3.5.3 装饰格栅工艺标准
严格按照设计要求施工,格栅进深与得小于500mm。